Bldgs #4 & 5 Water Shutoff Valve Insulation

On November 23, 2025, Paul Stimmel and Anne completed work to insulate the water shutoff valves at buildings #4 and #5. These improvements will effectively protect the valves through the winter.

Steps Completed:

  • Removed some gravel to access the pipes.
  • Wrapped the exposed pipes with reflective insulation.
  • Secured the insulation with outdoor duct tape.
  • Added 1.5″ foam board insulation around the wrapped pipes.
  • Constructed a foam-board lid to cover and protect the insulated section.

At building #4, the same steps were followed. An additional temporary foam-board box was built to fully surround the pipes for extra protection this winter.

Pictures of the process are attached.