No more dodging potholes—our beautiful road is now fully open to traffic!
Unfortunately, due to overcast and rainy weather, the tennis court project has been delayed. If the weather improves by the end of this week, work may begin then. If not, the forecast is looking much better for the weekend, so we’re hopeful things will dry out enough to get started early next week.
Weekend DIY Projects – Volunteers Welcome!
If you’re around this weekend and can spare an hour (or more), we’d love your help with some community DIY projects.
📞 Please contact Anne via call or text if you’d like to participate.
Below is the current Spring 2025 DIY List – it’s just a starting point, so if you see something else that needs attention, let Anne know and we can add it!
Building #1
- Landscaping:
- Weed pachysandra to free up hosta (parking lot side at 189 building)
- Rejuvenate rhododendron (King’s condo – lake side) – After bloom
- Structural:
- Build retaining border at 1A1 steps
- Reinforce fencing
- Paint:
- Paint red bench and picnic table
Lake Area
- Fill divots in seawalls caused by dock installation
- Number dock slips using stencil & paint or higher-quality stick-on numbers – Spring
Tennis Courts
- On Hold – Under Construction
Trees
- Inspect and trim dead limbs (e.g., spotted at pumphouse)
Pool Area
- Repair holes in fence
- Pressure wash pool deck – Spring
- Clean pool furniture
- Prune rhododendron at bath house – After bloom
- Build/install better protection for fob reader
- Purchase waterproof box for pool phone
- Use leaf blower to remove leaves and debris
Mailbox Area
- Replace mailbox roof with metal roofing to match buildings
- Ask full-time residents if they care, then arrange mailboxes in numeric order
Miscellaneous
- Gather large rocks to place around new culvert (prevent erosion)
- Pick up sticks in picnic grove
- Clean out grove firepit
- Remove dishwasher from pumphouse and take to dump

